Jumat, 22 November 2013

Paint Spectrum

Panther

16 November 2013

1 bh Seal Kopling 50.000
Pasang Bos Sentrik  50.000

1 kl Minyak Gemuk 15.000    
4 bh Bos Sentrik  up 40.000x4  = 160.000
1 bh Rak End   165.000
1 btl Minyak Power Steering      20.000
1 bh tali kipas B40 (pendek)     45.000
2 bh              A60 40.000 x2     = 80.000
1 set Pen Payung         25.000
2 bh Bola Sen     2.500x2        = 5.000
Ongkos                           200.000